Baldovie EFW CHP Facility is a new energy from waste site using around 110,000 tonnes of residual waste per year from Dundee and Angus to generate electricity.

 
 

The Challenge

Due to the nature of the build and technical challenges from the onset, Hart worked direct with the contractor and the consultants in the design phase to provide a solution to suit each challenge faced such as corrosion, odours, noise and infestation

Project/Doors Required

7 Insulated Roller Shutter
1 High Speed Door - Speedor Storm

 
 

Project Challenges

 

 

Odour & Noise
Concern over emissions Threat of odour abatement or noise order


 

Dust & Moisture
Dust and dirt containment Mechanical damage from dust


 

Advanced Specification
Technical knowledge and experience of waste sites

 
 

The Solution

Insulation is a key feature of an energy saving environment. Insulated roller shutters have a thermal value of minimum 0.69w/m.sq.k and 18db to minimise operational noise. The Speedor Storm is an extremely robust door with wind class 5 up to 8m. Moisture-controlled electrics protect from varying temperatures within a building, and mechanical components are protected from dust and dirt controlling the escaping dirt, odours and noise.

 
 

The Success

Following extensive communication with the contractor and the consultants to ensure the smooth running of the project, the steelwork was designed and installed correctly to allow for the timely installation of the Hart manufactured doors. Each door was made to measure and each activator and safety device fitted to suit the environment

 

Discuss The Best Product For Your Requirements

Send us a message or call us on +44 (0) 191 214 0404

and together we can help you choose
the best industrial doors for your premises

Make an Enquiry

We use cookies to provide you with a better website experience.

More Info I Agree